/
Equipment

Technical Capacity
Built In-House,Not Rented

Every unit below is drawn from MLD Construction’s registered equipment inventory —

tracked by chassis number, plate number and live operational status.

◆ Our Fleet & Supply ◆

Equipment & Materials

Toggle between our heavy-machinery fleet and the material categories our teams work with on site.

◆ High-Standard Safety ◆

Before Any Machine Moves

Checkpoints drawn from MLD Construction’s internal Occupational Health & Safety policy —

scroll to see the full sequence.

STEP 01

PPE Compliance Check

Helmet, vest, boots and site-specific protective gear are mandatory before any worker steps onto an active site.

STEP 02

Pre-Operation Vehicle Check

Operators inspect machinery — brakes, hydraulics, warning signals — before every start-up, in line with equipment condition records.

STEP 03

Site Access & Induction

Every worker and visitor is briefed on active hazards before entering a live construction zone.

STEP 04

Rest Hours & Fatigue Control

Staff are required to rest before 21:00 to prevent fatigue-related incidents on the following shift.

STEP 05

Substance-Free Worksite

Alcohol and drug use is strictly prohibited on all active sites, with disciplinary action for violations.

STEP 06

Incident Reporting

Any accident or near-miss is reported and reviewed against the safety policy to prevent recurrence.

STEP 07

Supervisor Oversight

Division chiefs and site supervisors are accountable for daily compliance across labour and machinery teams.

◆ Get Equipped ◆

Need Machinery for Your Next Project?

Tell us the scope and timeline — we’ll match the right units from our fleet, with real chassis and status records.