Every unit below is drawn from MLD Construction’s registered equipment inventory —
tracked by chassis number, plate number and live operational status.
Equipment & Materials
Toggle between our heavy-machinery fleet and the material categories our teams work with on site.
Before Any Machine Moves
Checkpoints drawn from MLD Construction’s internal Occupational Health & Safety policy —
scroll to see the full sequence.
STEP 01
Helmet, vest, boots and site-specific protective gear are mandatory before any worker steps onto an active site.
STEP 02
Operators inspect machinery — brakes, hydraulics, warning signals — before every start-up, in line with equipment condition records.
STEP 03
Every worker and visitor is briefed on active hazards before entering a live construction zone.
STEP 04
Staff are required to rest before 21:00 to prevent fatigue-related incidents on the following shift.
STEP 05
Alcohol and drug use is strictly prohibited on all active sites, with disciplinary action for violations.
STEP 06
Any accident or near-miss is reported and reviewed against the safety policy to prevent recurrence.
STEP 07
Division chiefs and site supervisors are accountable for daily compliance across labour and machinery teams.
Need Machinery for Your Next Project?
Tell us the scope and timeline — we’ll match the right units from our fleet, with real chassis and status records.